From development to operation, step by step
Every energy asset passes the same eight steps. Some clients need us for one of them, others for all eight.
Four phases
Steps 1 to 3
Develop
Is it worth building, how big, where, and who buys the power?
Step 4
Finance
Which money fits the project, and what does it need to see?
Steps 5 to 7
Build
Design, procure, construct and prove it works.
Step 8
Operate
Keep it producing what it was designed to produce.
Select a step to see what kWh delivers
Step 1 of 8, develop phase
Origination
Find out whether an energy asset fits the need, and roughly how big it should be.
What kWh delivers
- Site visit and a first look at consumption, fuel bills or grid supply
- A first size and an honest answer on whether it is worth studying further
Step 1 of 8, develop phase
Origination
Find out whether an energy asset fits the need, and roughly how big it should be.
What kWh delivers
- Site visit and a first look at consumption, fuel bills or grid supply
- A first size and an honest answer on whether it is worth studying further
Step 2 of 8, develop phase
Feasibility
Test the technical options and the economics before any money is committed.
What kWh delivers
- Demand and yield model, hour by hour, with solar, storage and backup together
- Capex, operating cost and the fuel or grid energy each option saves
- A clear recommendation with the assumptions written down
Step 3 of 8, develop phase
Development
Secure what the project needs to be built: site rights, permits, grid connection and a buyer for the power.
What kWh delivers
- Site and permit file, and the grid connection request
- Offtake or energy-supply terms that match the business case
- Shortlist of suppliers and contractors, with technical evaluation
Step 4 of 8, finance phase
Financing
Match the project to the right money: equity, debt, lease or energy-supply contract.
What kWh delivers
- Financial model and a structure that fits the offtaker
- The technical and financial package lenders and investors ask for
- Support to financial close
Step 5 of 8, build phase
Engineering
Turn the feasibility design into drawings, specifications and orders.
What kWh delivers
- Detailed electrical and civil design, single-line diagram and protection
- Procurement specifications and review of supplier offers
Step 6 of 8, build phase
Construction
Build to the design, safely, on time and within budget.
What kWh delivers
- Site management and construction supervision
- Quality checks against the design and a safe site
Step 7 of 8, build phase
Commissioning
Prove the plant does what it was designed to do before it carries the load.
What kWh delivers
- Test and acceptance plan, and the tests themselves
- As-built file and handover to operations
Step 8 of 8, operate phase
Operation
Keep the asset producing what it was designed to produce, for its whole life.
What kWh delivers
- Remote monitoring and maintenance planning
- Performance reports: measured against expected yield, fuel displaced and CO₂ avoided
- Advice when the load grows or the asset needs to expand
At which step is your project?
Tell us where you are, and we will tell you what the next step needs.