Time-of-use tariff development

When solar covers the midday hours, the expensive hours move to the evening. A time-of-use tariff gives customers a reason to use power when it costs least to make.

High-voltage transmission tower and lines over farmland at sunset

From round-the-clock grid use to the solar hours only

Under a flat tariff Horseed's pumps would draw from the grid day and night. With a cheaper rate in the solar hours, the grid runs the pumps and charges a battery while the sun is up, and the battery runs the pumps after dark.

A day of grid use at Horseed

Solar hours0100200300400kW00:0006:0012:0018:0000:00USD 0.20no grid use
  • From the grid
  • From the battery
  • Pumps (90 kW)

Grid bill per month

FlatTime-of-use
Saving with time-of-use
40% less, USD 112,896 a year
Battery needed
1,440 kWh
Grid draw in solar hours
290 kW
Indicative what-if, not a quote or project data. Horseed's three 30 kW pumps, 30 days a month, solar hours 08:00 to 16:00, battery round-trip efficiency 90%. Grid energy only: the cost of the battery is not included.

Move the load, not the land

City sites have sun but little room for solar panels. A battery needs a fraction of that ground. When the utility sells its midday solar power cheaply, a customer can buy all its power in the solar hours, store what it needs for the night and draw nothing from the grid after dark.

  • The customer pays less, without land for panels.
  • The utility sells more in the hours its solar makes power cheapest, and the evening peak falls.
  • kWh develops and finances the storage, sets up the tariff and the meters, and runs the system.
Battery containerSolar on site
Own solar for 24-hour pumping
~482 kWp
about 4,800 m² of land, and a battery for the night
Time-of-use instead
battery in one container of about 15 m²
Difference
~320× less ground. Double the load and the solar field doubles; the battery still fits a container.
Indicative, drawn to scale. Horseed's 90 kW of pumps for 24 hours is 2,160 kWh a day. Own solar sized on Horseed's expected yield (4.5 kWh per kWp a day) at about 1 hectare per MWp; a 20-foot battery container covers about 15 m² and holds up to about 3.5 MWh.

How we work

Who it is for

  • Utilities with solar or storage on the grid
  • Large customers able to move demand, such as water pumping
  1. 01

    Step 1: Read the load

    Hourly demand and generation cost per hour, from meter data and dispatch records.

  2. 02

    Step 2: Set the periods

    Peak, shoulder and off-peak windows that follow the real cost curve.

  3. 03

    Step 3: Price the periods

    Rates that keep the utility's revenue whole while rewarding customers who shift.

  4. 04

    Step 4: Simulate

    Expected shift per customer group, and what it does to the peak and to fuel use.

  5. 05

    Step 5: Introduce

    Meter configuration, billing rules and a pilot with large customers first.