Time-of-use tariff development
When solar covers the midday hours, the expensive hours move to the evening. A time-of-use tariff gives customers a reason to use power when it costs least to make.

From round-the-clock grid use to the solar hours only
Under a flat tariff Horseed's pumps would draw from the grid day and night. With a cheaper rate in the solar hours, the grid runs the pumps and charges a battery while the sun is up, and the battery runs the pumps after dark.
A day of grid use at Horseed
- From the grid
- From the battery
- Pumps (90 kW)
Grid bill per month
- Saving with time-of-use
- USD 9,408 a month
- 40% less, USD 112,896 a year
- Battery needed
- 1,440 kWh
- Grid draw in solar hours
- 290 kW
Why kWh exists
Move the load, not the land
City sites have sun but little room for solar panels. A battery needs a fraction of that ground. When the utility sells its midday solar power cheaply, a customer can buy all its power in the solar hours, store what it needs for the night and draw nothing from the grid after dark.
- The customer pays less, without land for panels.
- The utility sells more in the hours its solar makes power cheapest, and the evening peak falls.
- kWh develops and finances the storage, sets up the tariff and the meters, and runs the system.
- Own solar for 24-hour pumping
- ~482 kWp
- about 4,800 m² of land, and a battery for the night
- Time-of-use instead
- 1.44 MWh
- battery in one container of about 15 m²
- Difference
- ~320× less ground. Double the load and the solar field doubles; the battery still fits a container.
How we work
Who it is for
- Utilities with solar or storage on the grid
- Large customers able to move demand, such as water pumping
- 01
Step 1: Read the load
Hourly demand and generation cost per hour, from meter data and dispatch records.
- 02
Step 2: Set the periods
Peak, shoulder and off-peak windows that follow the real cost curve.
- 03
Step 3: Price the periods
Rates that keep the utility's revenue whole while rewarding customers who shift.
- 04
Step 4: Simulate
Expected shift per customer group, and what it does to the peak and to fuel use.
- 05
Step 5: Introduce
Meter configuration, billing rules and a pilot with large customers first.
Talk to us about time-of-use tariffs